Graphing Time Query Data
To graph a time query:
- Select the Dynamic workflow tab
- Select Entity Selection as the Selection Mode and select the Time Query from the Viewport or the Visibility Pane.
- Select Graph Data in the Properties Pane.
- The selected dynamic data will be plotted for all dynamic time steps occurring in the simulation at the specified Time Query point(s).
- If you have multiple points on the time query all data on the plot is scaled according to the spacing between query points and the absolute maximum and minimum values in the data set. This will normalize the data values to fit within the space between two query points for you to compare the relative difference between points at each time interval. Each data series corresponds to one query point in the time query.
- Use the Copy Data to Clipboard option to extract all query data to the Windows clipboard. The extracted data is not scaled.
- If you only have one point in your time query, the data in the plot will not be scaled.